Skip to main content

Alphavima UK

/
/
Custom Truck One Source
CLIENT STORY · EQUIPMENT AND FLEET

Three ERPs, one set of numbers

Growth through acquisition left Custom Truck One Source running several ERP systems that could not agree with each other, and a reporting cycle that took fifteen days to produce figures for a month that had already ended. We consolidated the data into one governed warehouse on Azure and put live Power BI dashboards in front of it, without replacing a single ERP.
15
days
of manual monthly reconciliation removed
3
ERPs
consolidated into one reporting model
40
+
manually assembled reports retired
0
ERPs
replaced to achieve it
THE CLIENT

What happens when growth arrives faster than the systems

Custom Truck One Source sells, rents and services specialised trucks and heavy equipment across North America. It grew substantially through acquisition, and each acquisition brought its own ERP.
That is not unusual and it is not a mistake. Consolidating systems during an acquisition is rarely the priority, and the cost of doing it badly is higher than the cost of waiting. But the bill arrives eventually, and it arrives in the finance function.
Three ERPs meant three definitions of an item, three ways of recording a rental, and three sets of numbers that had to be reconciled by hand before anyone could describe how the business was performing. By the time the reconciliation was done and the pack assembled, the month it described had been over for two weeks. Leadership was making decisions about the current period using a picture of the previous one.
WHAT WAS IN THE WAY

Four problems, and only one looked like a reporting problem

✗
Fifteen days of manual assembly per cycle. Exports pulled from each system, reconciled in Excel, then rebuilt into a pack. Every month, by hand.
✗
Multiple ERPs with incompatible data. The same customer, item or transaction represented differently in each system, with no agreed mapping between them.
✗
Silos between business units. Sales, rentals and service each had a view of their own performance and no reliable view of anyone else’s.
✗
Decisions taken on stale figures. The delay was structural, not a resourcing problem. More people assembling the pack faster would not have fixed the timing.
Hiring another analyst would have turned fifteen days into twelve. It would not have made the numbers current.
THE BRIEF

What we were asked to achieve

Note that none of these objectives is “replace the ERPs”. Consolidating the reporting turned out to be possible without touching the systems underneath, and that is the finding worth taking from this story.
01

One source of truth

A single dataset that every function reads from, so a question has one answer rather than three defensible ones.
02

Real-time visibility

Figures current enough to act on, rather than accurate as at a date that has already passed.
03

Automated ingestion

No manual export step anywhere in the chain, because a manual step is a step that gets skipped under pressure.
04

Numbers people trust

The hardest of the four. A dashboard nobody believes gets checked against a spreadsheet, which recreates the problem it replaced.
THE SOLUTION

A governed warehouse, and nobody had to replace an ERP

The instinct in this situation is to consolidate onto one ERP. That is a multi-year programme with real operational risk, and it was not what the reporting problem required.
01

Ingest continuously

Azure Data Factory pipelines drawing from each ERP on a continuous schedule, with no manual export anywhere in the chain.
Azure Data Factory
02

Reconcile in flight

The mapping between three different representations of the same customer, item or transaction applied on the way in, once, rather than by an analyst afterwards, every month.
03

Govern, do not merely store

Data lands in Azure Data Lake and Azure SQL with definitions, lineage and quality rules attached, so a figure can be traced back to the transaction that produced it.
Azure Data Lake · Azure SQL
04

Serve by role

Power BI on top with role-based access, so executives, branch managers and finance each see their own view of the same underlying dataset.
Power BI

Why the mapping is the project

Three systems, three definitions of an item. Reconciling that by hand once a month is a fifteen-day job. Encoding it once, as rules that run on every load, is a design exercise followed by a pipeline. The work is in agreeing the definitions, not in writing the code.

Why nothing was replaced

The three ERPs still run. They were doing their jobs perfectly well; what they could not do was agree with each other, and that is a reporting problem rather than an ERP problem. Solving it at the data layer avoided a multi-year programme and its operational risk.
THE RESULT

The figures did not get more accurate. They got current

This is the part that spreadsheet-based reporting hides. The old figures were not wrong. They were describing a period nobody could influence any more.
BEFORE · MANUAL CYCLE

Figures land on day fifteen

Fifteen of every thirty days spent assembling the previous month. The pack arrives describing a period that ended two weeks earlier, and the decisions it informs have already been taken.
AFTER · LIVE WAREHOUSE

Figures current at the moment they are opened

No assembly period. The same underlying transactions, from the same three systems. The difference is when you are allowed to look at them.
Reporting cycle as reported by the client.
RELATED

Where to go from here

Data engineering

The practice this project came out of. Pipelines, warehousing, quality and the model underneath the reporting.

Microsoft Fabric

Where this kind of estate lands now that Microsoft has consolidated its data platform. Including when Fabric is not the right answer.

ERP migration

If consolidating the reporting is not enough and the systems themselves have to move, this is the discipline that does it.
More client stories are published on the Alphavima group site.
COMMON QUESTIONS

What people ask about this project

If your question is not here, ask it directly. We would rather have the difficult conversation before a proposal than after one.
Because the problem was reporting, and the answer was proportionate to the problem. Consolidating three ERPs is a multi-year programme with real operational risk across sales, rentals and service. Consolidating the reporting took roughly six months and left every operational system running. Where the ERPs themselves are genuinely holding the business back, that is a different project with a different business case.
Yes. The ingestion layer reads from whatever produces the data. Most estates are mixed and designing as though they were not produces a fragile result. What the Microsoft stack gives you here is the warehouse, the governance and the reporting layer, not a constraint on where the data can come from.
By making them checkable rather than by asserting they are right. Every figure traces back to the transaction that produced it, the mapping rules are written down rather than living in someone’s head, and the warehouse reconciles to the source systems on a schedule. Trust in a dashboard is a function of whether somebody can prove it, and the proof has to be built in rather than added later.
Directly, in two ways. First, the profiling and mapping discipline here is the same discipline an ERP migration needs, and it is the part most partners skip. Second, if you are running more than one system and only one of them is moving to Business Central, this pattern is how the others keep contributing to one set of numbers in the meantime.
NEXT STEP

Reconciling systems by hand every month?

Tell us how many systems and how many days. Thirty minutes is usually enough to say whether the answer is a warehouse, a migration, or something smaller than both.