Skip to main content

Alphavima UK

/
Business Central

Business Central implementation services in the UK

An implementation is a series of decisions, and we make them in the right order. Discovery, design, configuration, data migration, testing and go live, with each stage signed off before the next one starts.
✓
Eight stages, and you always know which one you are in
✓
Your team runs a full period close before anyone signs off
✓
Extensions only where standard functionality genuinely will not do
✓
ISO 9001:2015 certified delivery
✓
AL development in house
✓
20+ years on the Microsoft stack

Scope your implementation

    Prefer to talk? Call +44 (776) 542 5935. ISO 27001 certified information security.
    WHERE PROJECTS GO WRONG

    Implementations rarely fail on the software

    Business Central works. It has been shipped and supported by Microsoft for years, and the functionality is not in doubt. When an ERP project goes badly, the cause is almost always somewhere else.
    The most common pattern is a deferred decision. The chart of accounts needs restructuring, but nobody wants to own it, so configuration starts against the old one and gets redone in month four. Or item numbering is left alone because changing it feels risky, and the reporting problem it causes surfaces after go live.
    Worth asking

    Warning signs in a proposal

    ✓
    A fixed timeline before anyone saw the data. A date offered in the first meeting is a sales position, not an estimate. Ask what it assumes about your data.
    ✓
    Data migration priced as a line item. If migration is a single figure with no profiling behind it, that figure is a placeholder and it will move.
    ✓
    No named people on your side. If the plan does not say who from your team is needed and for how many days, that time has not been budgeted and it will be found late.
    ✓
    Training scheduled for the final week. Training is not a handover event. If the first time users touch the system is the week before go live, adoption is already a problem.
    DISCOVERY

    What we establish before anything is configured

    Six things. None of them are about Business Central. All of them change what the system needs to do, and all of them are cheaper to answer now than in month four.
    01

    Your actual process

    Not the documented one. We sit with the people doing the work and follow a transaction end to end, including the workarounds that exist because the current system cannot do something.
    02

    The condition of your data

    Record counts, duplicates, orphans, chart of accounts sprawl and how consistently your item and customer numbering has actually been applied. This is a profiling exercise, not a conversation.
    03

    Every integration

    Including the ones nobody mentions because they are a scheduled export somebody set up years ago. Undiscovered interfaces are one of the most reliable ways to break a cutover.
    04

    What reporting has to produce

    Statutory accounts, board pack, covenant reporting, VAT, and whatever the bank or the auditor asks for. Reporting requirements drive dimension design, and dimension design is difficult to change later.
    05

    Who decides

    Named people with the authority to settle a design question in a week rather than a month. Projects do not usually stall on difficulty, they stall on a decision waiting for someone.
    06

    What is genuinely non-negotiable

    Most requirements described as essential turn out to be habits. Some are real, usually because of a regulator, a customer contract or an audit requirement. Separating the two early is the most valuable hour of the project.

    A note on process redesign

    Microsoft’s own implementation guidance puts business process definition, governance, training and change management ahead of configuration, and it is right to. The temptation on every project is to rebuild the current process in the new system because that is faster and nobody argues. It is also how organisations spend a Business Central budget to get their old system back with a different interface.
    HOW THE PROJECT RUNS

    Four phases, and both sides know what they owe

    Implementations are not delivered to you. They are delivered with you. Most of the plans we are asked to review describe only the partner’s work, which is where the surprise comes from.
    Stages 01 – 02

    Discover and design

    The stage that determines everything after it. We map the processes, profile the data and agree the target design: chart of accounts, dimensions, approval flows, numbering and reporting. It ends with a signed design, because starting configuration against an unsettled design is the single most expensive mistake available.
    WE DELIVER
    ·
    Process walkthroughs and a fit-gap analysis
    ·
    A data profile report on your current system
    ·
    Target design document with the decisions written down
    YOU PROVIDE
    ·
    Access to the people who actually run the processes
    ·
    Decisions on the chart of accounts and dimensions
    ·
    Sign-off, from someone empowered to give it
    Stage 03

    Configure and build

    Business Central is set up against the agreed design. Where standard functionality covers a requirement, we configure it. Where it genuinely does not, we decide between Power Platform and an AL extension. This is the most partner-weighted phase, and the one where your involvement is lightest.
    WE DELIVER
    ·
    Configured environment, built to the signed design
    ·
    Extensions or Power Platform components where agreed
    ·
    Regular demonstrations against real scenarios
    YOU PROVIDE
    ·
    Attendance at the demonstrations, with feedback
    ·
    Answers to the questions only your business can settle
    ·
    Discipline about change requests during the build
    Stages 04 – 05

    Data and integrations

    Master data first, then balances, then open transactions, each pass reconciled rather than loaded and hoped for. Integrations are rebuilt or reconnected at the same time, and the ones that only existed to prop up the old system are retired. Full detail is on the migration and integration pages.
    WE DELIVER
    ·
    Extraction, mapping, transformation and load
    ·
    Reconciliation reports after every migration pass
    ·
    Integration build, error handling and monitoring
    YOU PROVIDE
    ·
    Data cleansing decisions, and someone to make them
    ·
    Credentials and access to the systems being connected
    ·
    Verification that the reconciled figures are right
    Stages 06 – 08

    Test, train and go live

    This is the phase where the balance tips back towards you, and it should. We build the test environment, write the scenarios and run the training. Your team runs the transactions, closes a full period and signs off. Then a rehearsed cutover with a rollback position, followed by support through the first month ends.
    WE DELIVER
    ·
    Test environment, scenarios and defect tracking
    ·
    Training sessions and written process guides
    ·
    Cutover plan, rehearsal and named people on call
    YOU PROVIDE
    ·
    Your team’s time to run the tests properly
    ·
    A full period close, run by your finance team
    ·
    Sign-off before cutover, not after it
    CONFIGURE OR BUILD

    Four answers to a gap, in order of cost

    When standard functionality does not cover something, there are four routes. They are not equally priced and they are not equally maintainable. Working down this list in order is what keeps a Business Central implementation from becoming a software project.
    01

    Change the process

    The cheapest answer, and the one nobody offers. If the requirement exists because of a limitation in the old system, it may not need to survive the move.
    02

    Configure standard

    Dimensions, approval workflows, number series, document layouts and posting groups cover far more than most people expect before they see it.
    03

    Power Platform

    Power Apps and Power Automate sit beside the ERP rather than inside it. Cheaper to build, far cheaper to change, and no upgrade risk.
    04

    AL extension

    Real code, written by us. Justified when the requirement genuinely belongs inside the ERP posting logic. Every extension is a maintenance commitment across two releases a year.
    WHAT IT COSTS

    Why there is no price list on this page

    Any figure published without seeing your data is a guess dressed as a quote, and the gap between the guess and the invoice is where ERP projects earn their reputation.
    What we will tell you is exactly what moves the number, so you can work out roughly where you sit before you talk to anyone. Licensing is the easy part and it is published by Microsoft. The implementation is the variable, and five things move it more than anything else.

    What moves the cost

    ✓
    Data condition. The single biggest variable. Clean, consistently numbered data in one system is a different project from twelve years of three systems and a spreadsheet.
    ✓
    Entity count. One company is not three companies with intercompany postings and a consolidation.
    ✓
    Integrations. Each interface is scoped, built, tested and monitored. The count matters more than the complexity of any one of them.
    ✓
    Extensions. Every AL extension is build cost plus a maintenance commitment across two Microsoft releases a year.
    ✓
    Your availability. Projects where the client cannot free up decision-makers run longer, and elapsed time costs money on both sides.
    COMMON QUESTIONS

    What UK finance teams ask about implementation

    If your question is not here, ask it directly. We would rather have the difficult conversation before a proposal than after one.
    It depends far more on your data and your decision-making than on the software. A single-entity finance-led implementation with clean data is a different project from a multi-company manufacturing migration off a modified NAV build. We give a timeline after the assessment, not before it, because a date offered before anyone has looked at your data is a guess.
    More than most proposals admit. Discovery needs the people who actually run the processes. Design needs someone who can settle a chart of accounts question. Testing needs your finance team to run a full period close, not watch one. We set out the day commitment by phase during scoping so it is budgeted rather than found late.
    Usually not all of them. In our experience a significant share of long-standing customisations exist because the original system could not do something Business Central now does as standard, or because a process was designed around a limitation that no longer applies. We categorise each one as replace with standard functionality, rebuild as an extension, replace with Power Platform, or retire. The retire column is normally larger than clients expect.
    The consultants who configured the system, working with the people who will use it, against your own transactions rather than a demonstration dataset. Written process guides come out of the same sessions. Training is spread through testing rather than compressed into the final week, because a handover event is not training.
    It goes through change control, and change control exists so that both sides can see the cost of a decision before it is taken rather than after. Requests are assessed for effort, schedule impact and whether they are better handled after go live. A surprising number turn out to belong in the second category.
    We stay close through the first month ends, which is when the questions that actually matter arrive. After that the arrangement moves to a support agreement covering functional and technical support, configuration changes and the twice-yearly Microsoft release cycle.
    NEXT STEP

    Scope your Business Central implementation

    Tell us what you run today and what is forcing the change. We will come back with a sequence, a shape and the risks in your data, before anyone talks about a price.