DYNAMICS GP SUPPORT ENDS 31 DECEMBER 2029
ERP migration to Business Central, from GP, NAV, AX and legacy systems
Nothing moves until we know what you actually have. Your data is the migration; everything else is configuration. This page is about method: what gets profiled before anyone quotes, how data is mapped and reconciled, and how a cutover is rehearsed rather than hoped through.
✓
Data profiled and counted before an estimate is written, not after
✓
Master data, then balances, then open transactions, reconciled at every pass
✓
A rehearsed cutover with a rollback position and named people on call
✓
Data engineering practice in house
✓
ISO 27001 certified
✓
GP · NAV · AX · Sage · bespoke
Book a migration assessment
Thirty minutes on your data, your version and what is forcing the change.
Prefer to talk? Call +44 (776) 542 5935. ISO 27001 certified information security.
WHAT THIS ACTUALLY IS
A migration is a data project wearing an ERP project’s clothes
Business Central is a known quantity. It has been shipped and supported by Microsoft for years and its behaviour is documented. What is not known is what your data will do when it meets it.
Every partner can configure the destination. Far fewer will look properly at the source before quoting, because looking properly is unbillable work that tends to reveal how much the project will really cost. That is precisely why it should happen first.
A chart of accounts that grew by accretion over twenty years. Item numbers where the meaning lives in the third and seventh characters, applied consistently until 2019. Customers who exist three times because someone abbreviated the company name differently each time. Twelve years of transactions spanning two changes to how a rule was applied. None of that is unusual, and none of it appears in a demonstration.
Alphavima runs data engineering as a service line in its own right, not as a subroutine of the ERP practice. Pipelines, warehousing, reconciliation and ETL are what we do when there is no ERP involved at all. That is the capability a migration actually needs.
In our experience
Where migrations actually fail
✓
Data assumed clean. Nobody profiles it. The duplicates, orphans and records with no cost against them arrive on cutover weekend, where fixing them is considerably more expensive.
✓
Mapping decisions deferred. The chart of accounts needs restructuring, nobody wants to own it, so the load runs against the old one and gets redone.
✓
One load, no rehearsal. A single migration run on the cutover weekend, with no earlier pass to discover what breaks. Everything found on the night is found under time pressure.
✓
No agreed definition of correct. If nobody said in advance what the migrated data must reconcile to, there is no way to declare the migration finished. It just stops.
BEFORE QUOTING
What we profile, and why the answer changes the price
This is a measurement exercise, not a conversation. It produces a report with counts in it, and those counts are what a migration estimate should be built from.
01
Volume and shape
Record counts by type, growth rate, and how far back the transactional history goes. Volume alone rarely drives cost. The spread of exceptions inside it does.
02
Duplicates and orphans
Customers and suppliers existing more than once under near-identical names. Transactions pointing at master records that no longer exist. Both need a decision before anything loads.
03
Chart of accounts sprawl
How many accounts, how many are still posted to, and how much of the structure is doing work that dimensions should be doing. This is usually where the largest redesign decision sits.
04
Numbering conventions
Whether item and customer codes carry meaning in specific character positions, and how consistently that was applied. A convention followed for eleven years and then abandoned is worse than none.
05
Customisations and extensions
What was modified, what it does, and whether anyone still needs it. Categorised into replace with standard functionality, rebuild as an extension, replace with Power Platform, or retire.
06
Integrations, including the forgotten ones
The scheduled export somebody set up years ago that nobody owns. Undiscovered interfaces are one of the most reliable ways to break a cutover.
METHOD
Nothing reaches Business Central until it reconciles
Data moves in a defined order through a gate that either passes it or sends it back. What fails goes back for correction and runs again. It does not get written anyway.
01
Profile
Counts, duplicates, orphans and exceptions measured against the source, before any mapping is designed.
02
Map
Every source field to a target field, with the transformation rule written down and the exceptions named.
03
Transform
Cleansing decisions applied as code, so the same rule produces the same result on every subsequent pass.
04
Reconcile
Trial balance, aged debtors and creditors, stock quantity and value, and open document counts. Pass, or return for correction.
05
Rehearse
Timed dress rehearsals until the elapsed time is known, which is what turns a cutover window into a plan rather than a hope.
·
Pass one exists to fail
The first run is a discovery exercise. Its job is to surface what breaks while there is still time to decide what to do about it, not to succeed.
·
Correct is defined in advance
Reconciliation targets are agreed in writing before the first load. Without them there is no way to declare a migration finished; it simply stops.
·
The cutover is rehearsed
A rehearsed sequence, a known elapsed time, a rollback position and named people on call. Everything discovered on the night is discovered under time pressure.
TOOLING
What Microsoft’s migration tools do, and what they do not
Microsoft ships cloud migration tooling for Dynamics GP and for on-premises Business Central and NAV. It is good, it is free, and it is worth using. It is also frequently presented as the whole answer, which it is not.
THE WORK
MICROSOFT TOOLING
SOMEBODY HAS TO DO IT
Move a defined set of master data
Yes
—
Move opening balances
Yes
—
Decide what should come across at all
No
Profiling, then a retention decision
Restructure a chart of accounts
No
Design, with your finance team
Resolve duplicate customers and suppliers
No
Cleansing rules, applied as code
Reconcile the result
No
Defined targets and a report per pass
Migrate from Sage or a bespoke system
No
Extraction and transformation, built
The tooling handles the mechanical part well. Everything in the right-hand column is where a migration succeeds or fails.
PATHWAYS
Where are you moving from?
The system you are leaving determines the plan far more than the one you are moving to.
Support ends 2029
Dynamics GP
Microsoft product support ends 31 December 2029, with security updates to 30 April 2031. Enough runway to plan properly, not enough to wait.
Most common
Dynamics NAV
Navision and NAV, including heavily modified builds. The customisation review usually retires more than it rebuilds.
Fit check first
Dynamics AX
Sometimes Business Central is the right destination and sometimes Finance and Operations is. We will tell you which before you commit, including when the answer is neither.
Sage and bespoke
Legacy ERP
Sage, in-house systems and unsupported platforms. Usually the hardest data and the clearest business case, in that order.
COMMON QUESTIONS
What UK finance teams ask about migration
If your question is not here, ask it directly. We would rather have the difficult conversation before a proposal than after one.
Not all of it needs to come across. Most organisations migrate open items, current balances and a defined number of prior periods, then keep the rest in a read-only archive or a reporting database. Moving twenty years of transactional history into a new ERP usually costs more than it returns, and it carries the old system’s data quality problems with it. We agree the retention position during planning so it is a decision rather than a discovery.
Microsoft has published that product support for Dynamics GP, covering enhancements, tax updates and technical support, ends on 31 December 2029, with security updates continuing until 30 April 2031. Older fixed-lifecycle versions have earlier dates. That is enough runway to plan a migration properly rather than rushing one, but it does mean planning should start well before 2029. Check Microsoft’s lifecycle documentation for the position that applies to your specific version.
It does part of it. Microsoft ships cloud migration tools for Dynamics GP and for on-premises Business Central and NAV, and they move a defined set of master data and balances well. What they do not do is decide what should come across, restructure a chart of accounts, resolve duplicate customers, or reconcile the result. Those are the parts that take the time, and they are the parts that determine whether the migration is trustworthy.
Because “correct” is defined in advance, in writing, as a set of reconciliations: trial balance to trial balance, aged debtor and creditor totals, stock quantity and value by location, and open document counts. Every pass produces a reconciliation report against those figures. Anything that fails goes back for correction and runs again. Nothing gets written anyway.
Several. A first pass exists to discover what breaks, not to succeed. Later passes narrow the exceptions until the reconciliation is clean and the elapsed time is known, which is what makes the cutover window a plan rather than a hope. A single load attempted on the cutover weekend is the most common reason a go live slips.
Usually yes for operational areas, and no for the financial cutover. The common shape is finance and one operational area first, then stock or projects, then the integrations previously handled by re-keying. What cannot be phased is the general ledger: you cannot run two ledgers as the system of record and expect either to be right.
NEXT STEP
Find out what your data will actually do
A migration assessment profiles your source system and produces counts, not opinions. That report is what a credible estimate is built from.